
For main contractors
RAMS, programme, and a crew that turns up.
Specialist zinc, copper and standing seam for London sites. Call before the substrate is finished if you want a metal package that lasts — and does not hold the job hostage.
10 years
workmanship warranty
15–20 years
on full build-ups
80–100 years
zinc, if the substrate is right
£5m / £10m
public & employer’s liability
RAMS first
Site-specific assessments and method statements before the first lift.
Insured & ticketed
£5m PL, £10m EL. CSCS / SSSTS / SMSTS. CDM 2015.
On programme
A specialist crew, extra hands when needed. Weather treated as a fact, not an excuse.
Small on purpose
Not a general contractor. Hard metals only — zinc, copper, aluminium, PLX.

The substrate decides the lifespan
Do not close the deck until the metal contractor has seen it.
Most metal-roof failures start under the sheet. Metalico inspects the build-up before covering it. If you want generational weather protection, ask for the full build-up service — structure to seam, one responsibility.
metalicoroofing.co.ukVMZINCelZincNedZincNordic CopperKMEPREFAGreenCoat PLX
On site
How the metal package runs on a London programme.
- 01
Call before the substrate is finished
The deck, vapour control and ventilation decide whether the metal lasts. Bring Metalico in while those layers can still change.
- 02
RAMS before anyone climbs
Site-specific risk assessments and method statements for every job. CDM 2015, Work at Height, scaffold and edge protection as the programme requires.
- 03
A crew that turns up
A tight specialist team, extra hands when the programme needs them. The person who priced the job stays close to the person forming the seam.
- 04
Handover paperwork
Inspection, manufacturer warranty path, and a 10-year workmanship certificate — 15–20 years where Metalico takes the full build-up.

Insurance & tickets
What you can put in the pack.
- Public liability
- £5 million
- Employer’s liability
- £10 million
- Workmanship
- 10 years · 15–20 on full build-up
- Team
- CSCS · SSSTS · SMSTS
Directed by Billy Leach. Company No. 17153032. Based 72 Durham Road, Bromley, BR2 0SW.
Tender questions
Straight answers for the prelims.
Are you CDM compliant?
Yes. Metalico works under CDM 2015 with site-specific RAMS, CSCS / SSSTS / SMSTS on the team, and insurance in place: £5m public liability and £10m employer’s liability.
Will you hold the programme?
That is the offer to main contractors: a metal package that does not take the job hostage. Weather windows are real — winter working continues within safe limits.
Package or specialist metal only?
Either. A complete standing-seam package including build-up, or the metal skin only where the substrate is already yours. Say which when you send the programme.
How do we get you on the next job?
Drawings, postcode, start window. Email [email protected] or call 07951 657 342. Billy directs every project.
Talk to Metalico
Send the programme.
Drawings, start window and whether you need the full build-up or the metal skin only. RAMS follow once the site is known.